Name of Plant : 2 X 100 MW Mindanao Power Barges (PB 117 & PB 118) (A4)  
Name of IPP : Consortium of Mitsui & Co., Ltd.; Mitsui Engineering & Shipyard, Ltd.;  
  Burmeister & Wain Scandinavian Contractor S/S  
Contract Type : Operating and Maintenance Agreement (originally BTO)/  
  Energy Conversion Agreement/Solicited  
Status of Plant : Operational  
Cooperation Period : 15 years (July 1994 - July 2009)  
     
Nature of Issue Issue Recommendation
Termination of Agreement Whether to Continue or Discontinue the barge operation. Mindanao experienced drought and suffered from unreliable system. These conditions are likely to recur. During the times the barges were needed, the power barges had served their purpose which was to provide reliability in the system. However, with possible entry of Mindanao Coal Power Plant, PSALM must conduct a cost-benefit analysis on the retention of power barges.